Deck before extension
       
     
 Deck after extension, staining and adding glass panel to railing
       
     
 Deck before extension
       
     
 Deck after extension, staining and adding glass panel to railing
       
     
 Before adding deck
       
     
 Added deck over patio and incorporated deck around above ground pool.  Includes safety self closing gates and designed for potential future expansion.
       
     
 Deck surround for hot tub.
       
     
 2nd level deck
       
     
 Large deck intended for entertaining lots of friends
       
     
 Two tiered deck
       
     
 This second level composite deck was just too small.
       
     
 Staley Transformations more than doubled the usable space.  We used the same composite decking and "fingered" it in so that in time all the boards will match and no one will even know that an addition was done to the deck.
       
     
 Composite deck after
       
     
 The same composite deck before
       
     
 Very tired and structurally unsound deck
       
     
 Power washed, replaced most of the baulesters, replaced the top rail and added fascia board under rail, and replaced several deck boards.  Then stained it all.
       
     
 This area adjacent to the deck was an eye sore. 
       
     
 We relocated the AC unit and cleaned up the area by adding retaining wall block and river rock.
       
     
 Stairs and water errosion made this area unsafe
       
     
 We re-routed the downspout under ground and down the hill so the errosion problem was resolved.  Added stepping stones and a set of new stairs.  
       
     
 Deck before extension
       
     

Deck before extension

 Deck after extension, staining and adding glass panel to railing
       
     

Deck after extension, staining and adding glass panel to railing

 Deck before extension
       
     

Deck before extension

 Deck after extension, staining and adding glass panel to railing
       
     

Deck after extension, staining and adding glass panel to railing

 Before adding deck
       
     

Before adding deck

 Added deck over patio and incorporated deck around above ground pool.  Includes safety self closing gates and designed for potential future expansion.
       
     

Added deck over patio and incorporated deck around above ground pool.  Includes safety self closing gates and designed for potential future expansion.

 Deck surround for hot tub.
       
     

Deck surround for hot tub.

 2nd level deck
       
     

2nd level deck

 Large deck intended for entertaining lots of friends
       
     

Large deck intended for entertaining lots of friends

 Two tiered deck
       
     

Two tiered deck

 This second level composite deck was just too small.
       
     

This second level composite deck was just too small.

 Staley Transformations more than doubled the usable space.  We used the same composite decking and "fingered" it in so that in time all the boards will match and no one will even know that an addition was done to the deck.
       
     

Staley Transformations more than doubled the usable space.  We used the same composite decking and "fingered" it in so that in time all the boards will match and no one will even know that an addition was done to the deck.

 Composite deck after
       
     

Composite deck after

 The same composite deck before
       
     

The same composite deck before

 Very tired and structurally unsound deck
       
     

Very tired and structurally unsound deck

 Power washed, replaced most of the baulesters, replaced the top rail and added fascia board under rail, and replaced several deck boards.  Then stained it all.
       
     

Power washed, replaced most of the baulesters, replaced the top rail and added fascia board under rail, and replaced several deck boards.  Then stained it all.

 This area adjacent to the deck was an eye sore. 
       
     

This area adjacent to the deck was an eye sore. 

 We relocated the AC unit and cleaned up the area by adding retaining wall block and river rock.
       
     

We relocated the AC unit and cleaned up the area by adding retaining wall block and river rock.

 Stairs and water errosion made this area unsafe
       
     

Stairs and water errosion made this area unsafe

 We re-routed the downspout under ground and down the hill so the errosion problem was resolved.  Added stepping stones and a set of new stairs.  
       
     

We re-routed the downspout under ground and down the hill so the errosion problem was resolved.  Added stepping stones and a set of new stairs.